CALL FOR PROPOSALS
GLOBAL 3mm VLBI ARRAY
Deadline: 1 February 2019
VLBI proposals for observing at 3mm wavelength (86 GHz) using:
the VLBA, GBT*, EFFELSBERG, PICO VELETA, ONSALA, METSAEHOVI,
YEBES and KVN telescopes should be submitted by
1 FEBRUARY 2019 (UT 22:00)
==========================
Successful proposals will be considered for scheduling in GMVA
Session II 2019 (3 - 8 October) or in a later session.
* SEE ALSO THE SECTION BELOW REGARDING PROPOSALS FOR GMVA
* OBSERVATIONS TOGETHER WITH PHASED-ALMA IN ALMA CYCLE 7
=============================================
| |
| ALL PROPOSALS SHOULD BE SUBMITTED USING |
| |
| THE NRAO PROPOSAL SUBMISSION TOOL (PST): |
| |
| https://my.nrao.edu |
=============================================
In order to maximize the sensitivity for continuum observations
the GMVA will record at the highest bitrate which instrumentation
and resources permit. Currently all telescopes will record at
2 Gbps (except the KVN, which will record in a compatible 1 Gbps
mode). All data will be correlated at the Bonn DiFX software
correlator.
* The GBT may be included in GMVA observations if a sufficiently
compelling justification is given in the proposal but the amount
of time available will be reduced compared to earlier observing
semesters, and observing blocks greater than 6 hours will be
very difficult to schedule.
The KVN can be selected using the "Other Stations" text field in
the PST.
Note that the availability of NOEMA (PLATEAU DE BURE) for GMVA
Session II in 2019 and later sessions is currently uncertain.
For further details on proposing, including the possibility of
additional support observations at 7mm (43 GHz), please consult
the administrative and technical information hosted at the MPIfR:
http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm
The Global mm VLBI Array
www3.mpifr-bonn.mpg.de
Astronomy with Very Long Baseline Interferometry at Millimeter Wavelenghts
---------------------------------------------------------------------------
PARTICIPATION OF ALMA IN GMVA OBSERVATIONS IN ALMA CYCLE 7
==========================================================
It is expected that phased ALMA will participate in some GMVA
observations during ALMA Cycle 7 (Oct. 2019 - Sept. 2020).
Please look for the ALMA Cycle-7 pre-announcement:
https://almascience.org/news/alma-cycle-7-pre-announcement
There are likely to be ~43 ALMA antennas available in Cycle-7 but
the phased sum used for VLBI will be formed only from those that
lie within a circle of radius 0.5 km (or less, depending on
atmospheric conditions).
Observations together with ALMA in Cycle-7 will only be possible
in one session. GMVA session dates for 2020 are not yet fixed
but Session I 2020, which is traditionally in the period
March-May, should provide an opportunity for GMVA+ALMA observing.
Currently the dates for GMVA observations together with ALMA in
cycle-7 have not yet been fixed.
**********************************************************************
* *
* Any new GMVA proposal requesting phased ALMA during Cycle 7 must *
* *
* be submitted via the NRAO PST at the 1 February 2019 deadline. *
* *
**********************************************************************
Proposers should:
- specify "ALMA" in the Other Stations text field in the PST
- select the default GMVA 3mm observing mode of 2 Gbps, dual
polarization.
- specify the amount of time and GST range(s) needed for ALMA
separately, either in Session Constraints or Comments, or in
the Technical Justification.
A separate proposal to ALMA must also be submitted at the deadline
for ALMA Cycle 7 proposals on 17th April 2019. For this, all
proposers (PI's and Co-I's) must be registered ALMA users.
(see: www.almascience.org)
Resubmission of ALMA Cycle 6 proposals
======================================
The outcome of GMVA+ALMA Cycle 6 observations scheduled in April
2019 will not be known until after the ALMA Cycle 7 proposal
deadline. If the PI wishes to mitigate against the possibility
that these observations are not completed successfully, the
proposal must be resubmitted to ALMA by the Cycle 7 proposal
deadline and undergo a new review. The proposal does not need to
be resubmitted to the GMVA in this case. Observations in Cycle 7
will only occur if the April 2019 observations are not completed
successfully and the ALMA Cycle 7 proposal is ranked high enough
for scheduling.
However, if the PI wishes to obtain a second epoch of GMVA+ALMA
observations, even if the April 2019 observations are successful,
a new proposal must be submitted to both the GMVA and ALMA by
their respective proposal deadlines.
Restrictions on GMVA+ALMA proposals in ALMA Cycle 7
===================================================
GMVA observations with ALMA will be limited to a fixed recording
mode, which currently provides 2 Gbps on all baselines.
The KVN telescopes will not be available in this mode.
Only VLBA telescopes will be available at 7mm in this mode.
Due to the need to phase up on science target sources themselves
they will be restricted to those with a flux density >0.5 Jy
contained within an unresolved core on ALMA baselines up to 1 km.
In order to make a clean linear-to-circular polarisation
transformation of ALMA recordings, any target source must be
observed for a duration of at least 3h (breaks for calibrators
permitted) to sample a range of parallactic angles.
Large Programs (>50 hours of observing time) are not permitted
because phased ALMA is a non-standard mode.
No long-term programs may be proposed, and no proposals will be
carried over into the next cycle.
There is a cap for VLBI of 5% of ALMA Cycle 7 observing time. As
time for GMVA observations will thus be scarce, proposals should
include a quantitative justification as to why ALMA is essential
for the goals of the project.
=============================================================================